Home » Construction
Tectona Mitra Utama delivered the complete 2-bay fabrication workshop project in Berau, East Kalimantan. Our scope covered material procurement, fabrication, foundation, structural, architectural, outdoor facilities, and MEP installations, all executed
In Kaliurang, East Kalimantan, Tectona Mitra Utama was entrusted with the construction of a 2500 m² two-story mess facility. The project integrated a steel structure, pile foundation, and sandwich panel
Tectona Mitra Utama executed the Solar Power Plant project in East Kalimantan. Our responsibilities covered the construction of foundations for the solar panel arrays, as well as developing essential supporting
The proposed scope of work includes supervising geotechnical investigation activities by deploying two (2) Field Geotechnical Engineers on-site, with responsibilities limited to daily support, as further detailed in the following
PT Asmin Bara Bronang (ABB) is the holder of Generation III Coal Mining Business Agreement (PKP2B) based on the Decree of the Minister of Investment No. 198 / A.1 /