Coal Washing Plant Foundation

Coal Washing Plant Foundation

PT Asmin Bara Bronang (ABB) is the holder of Generation III Coal Mining Business Agreement (PKP2B) based on the Decree of the Minister of Investment No. 198 / A.1 / 1999 dated 30 April 1999.

In 2019, ABB planned to build a semi-mobile Coal Washing Plant with a capacity of 125 tons per hour, allowing for potential relocation in the future. As crucial preparatory data for the construction stage, comprehensive soil investigation was conducted to obtain suitable foundation design data. PT Tectona Mitra Utama carried out the soil investigation and foundation design to support the construction of this Coal Washing plant.

Other Projects