Transmission Shelter for MNC Visions

Transmission Shelter for MNC Visions

TMU successfully built the transmission shelter for MNC Visions located in Bali. The shelter was built using steel structure and covered with prefabricated panels. The construction progress was completed within 1.5 months with total of 2000 man hours and zero accident.

Other Projects