Home » Camp Facilities
In Kaliurang, East Kalimantan, Tectona Mitra Utama was entrusted with the construction of a 2500 m² two-story mess facility. The project integrated a steel structure, pile foundation, and sandwich panel
In an effort to support mining operations in the BMB Cluster, PTCK plans to carry out Extend Mine Office Tabuhan works in the Binuang area, Tapin Regency, South Kalimantan.
The mine camp facilities area is constructed on a 2-hectare site boundary, with a building area of approximately more than 5200 m. The mine camp facilities comprise of 17 buildings,
TMU has been awarded by Kalimantan Prima Persada (a subsidiary of PT Pamapersada Nusantara) operating in mining contractor to build mine camp facility for 250 persons of mine workers over
TMU successfully built the temporary facility for mining contractors in Semesta Alam Barito (SAB) coal mine project located in Central Kalimantan. The facility includes camp for workers, workshop for HD777,